Seneca Resource Recovery, Neasden, North London

Minerals & Waste

DWD has provided planning advice to Seneca Resource Recovery, part of Carey Group, on its Materials Recovery Facility (MRF) in Neasden, North London.

The MRF has planning permission to accept approximately 1 million tonnes per annum of waste from various sources and also produces Refuse Derived Fuel (RDF) for use in energy from waste plants. The MRF is served by a rail siding and the planning permission also provides for a biomass plant


Project Overview

DWD has provided planning advice to Seneca Resource Recovery, part of Carey Group, on its Materials Recovery Facility (MRF) in Neasden, North London.

The MRF has planning permission to accept approximately 1 million tonnes per annum of waste from various sources and also produces Refuse Derived Fuel (RDF) for use in energy from waste plants. The MRF is served by a rail siding and the planning permission also provides for a biomass plant


Contact

Geoff Bullock

020 7489 4892

geoff.bullock@dwdllp.com